Consutlancy Services for Taif-Baha Water Transmission System
The project comprises engineering services for the construction of a 217 km pipeline network of diameter 40 inches which will deliver desalinated water from Taif (Reservoir to be built: 80,000 m3) to Baha (existing strategic reservoir: 300,000 m3), a fresh water pumping station will supply 80,000 m3/d with tap-off stations at Sudraya, Shuqsan, Ghazayel and Hadan, Abo Raka and Arada.

Disziplinen
- Wasserversorgung
- Wasserbau
Gesellschaften
Dorsch Holding GmbH KSA
Auftraggeber
Saline Water Conversion Corporation (SWCC)
Dauer
Von 2010 bis 2015
Standort
Ghazaial , Saudi-Arabien
Projektleistungen
- Design review
- Construction supervision
- Project management