Consutlancy Services for Taif-Baha Water Transmission System

The project comprises engineering services for the construction of a 217 km pipeline network of diameter 40 inches which will deliver desalinated water from Taif (Reservoir to be built: 80,000 m3) to Baha (existing strategic reservoir: 300,000 m3), a fresh water pumping station will supply 80,000 m3/d  with tap-off stations at Sudraya, Shuqsan, Ghazayel and Hadan, Abo Raka and Arada.

Disziplinen

  • Wasserversorgung
  • Wasserbau

Gesellschaften

Dorsch Holding GmbH KSA

Auftraggeber

Saline Water Conversion Corporation (SWCC)

Dauer

Von 2010 bis 2015

Standort

Ghazaial , Saudi-Arabien

Projektleistungen

  • Design review
  • Construction supervision
  • Project management

Kontakt

Gesellschaften