Airport „Franz-Josef-Strauß“, General Planning Civil Engineering - Ramp 2

Extension of Munich Int’l Airport by a Terminal (20 MPA) as well as an apron in the East. The following was included:

  • Apron (520.000 m² approx. / 28 gate and 20 remote positions)
  • Fuel hydrant supply
  • Taxiway bridges
  • Roads
  • Bridges
  • Parking areas
  • Fencing
  • 3 Tunnel constructions (people mover, utilities, baggage, Metro)
  • Potable water
  • Fire water
  • Stormwater incl. retention basins
  • Foulwater
  • Airfield lighting
  • Docking systems
    • Outer lighting and apron flood lighting
    • Communication lines
    • Power supply incl. sub-stations
    • 400 Hz equipment
    • Ground service equipment shop
    • Meteorological station extension

Disciplines

  • Buildings & Architecture
  • Airports

Companies

Dorsch Engineers GmbH

Client

Flughafen München GmbH

Duration

From 1998 to 2004

Location

Munich, Germany

Project Activities

  • Basic Design
  • Detailed Design
  • Coordination with local Authorities
  • Final Design
  • Tendering
  • Construction Supervision
  • Project Management Services
  • Document Management