Airport „Franz-Josef-Strauß“, General Planning Civil Engineering - Ramp 2
Extension of Munich Int’l Airport by a Terminal (20 MPA) as well as an apron in the East. The following was included:
- Apron (520.000 m² approx. / 28 gate and 20 remote positions)
- Fuel hydrant supply
- Taxiway bridges
- Roads
- Bridges
- Parking areas
- Fencing
- 3 Tunnel constructions (people mover, utilities, baggage, Metro)
- Potable water
- Fire water
- Stormwater incl. retention basins
- Foulwater
- Airfield lighting
- Docking systems
- Outer lighting and apron flood lighting
- Communication lines
- Power supply incl. sub-stations
- 400 Hz equipment
- Ground service equipment shop
- Meteorological station extension

Disciplines
- Buildings & Architecture
- Airports
Companies
Dorsch Engineers GmbH
Client
Flughafen München GmbH
Duration
From 1998 to 2004
Location
Munich, Germany
Project Activities
- Basic Design
- Detailed Design
- Coordination with local Authorities
- Final Design
- Tendering
- Construction Supervision
- Project Management Services
- Document Management