B 41 / B 270 / L 160 – Junction reconstruction near Fischbach
The measure includes the reconstruction of two level junctions (partly with traffic signals) on the B 41 into a complex junction without a layout. The predicted traffic load on the B 41 is 24,000 vehicles per 24 hours, which is why it will be equipped as far as possible with intersections without a segment plan. The B 41 will be linked with the B 270 and the L 160 via a large roundabout located below the B 41. For this purpose, a bridge structure with a length of 65 m must be built in the course of the B 41. In the downstream road network, another roundabout will connect a municipal road and a new lorry parking area as well as an access road to a petrol station to the L 160.
Construction length: 0.7 km (B 41) + 0.4 km (B 270) + 0.3 km (L 160) + 0.1 km (municipal road)

Disciplines
- Roads
Companies
GRE German Rail Engineering GmbH
Client
Public Mobility Office Rheinland-Pfalz (Bad Kreuznach)
Duration
From 2004 to 2012
Location
Bad Kreuznach (Rhineland-Palatinate) , Germany
Project Activities
- Variant investigation with up to 3 variants
- Design surveying, HOAI work phase 1-6
- Project planning for all traffic facilities, HOAI work phase 1-5
- Construction phase plans
- Landscape conservation plan and expert contribution on species protection