Integrated Conceptual Study and Consultancy for the BVW#7 Gas Compressor Station

To increase the transmission capacity of the existing Yadana Gas Pipeline System, the BVW#7 Compressor Station is planned as an essential expansion facility along the 42‑inch, 238‑kilometre pipeline, which includes 12 block valve stations as well as metering and pigging facilities.

The new compressor station comprises inlet filter separators, a fuel gas system, gas coolers, station piping, utility systems, buildings and shelters. It is equipped with the full range of instrumentation and control systems required for local operation, with provisions for future remote‑control capability.

Dorsch initially carried out a conceptual study to define the operational and technical baseline of the overall Yadana pipeline system. Based on this study, Dorsch was subsequently awarded the consultancy services contract for the development of the BVW#7 Compressor Station, including technical definition and design support for its implementation.

Disciplines

  • Oil & Gas

Companies

Dorsch Consult asia Co., Ltd.

Client

PTT Public Company Limited, Thailand

Duration

From 2003 to 2006

Location

Kanchanaburi , Thailand

Project Activities

  • Hydraulic simulation and analysis of existing pipeline system
  • Soil Survey
  • Front End Engineering Design (FEED)
  • Safety, health and environment (SH&E) analysis
  • Tender Engineering
  • Procurement
  • Project Management
  • Quality Management
  • Design Supervision
  • Construction Supervision

Contact