Road Projects
1. Jakarta-Cikampec Highway
Toll road comprising about 68 km of multi-lane highway and 15 km of feeder roads (for which improvement measures were also recommended), interchanges, special river bridges, standard structures, and toll plazas.
2. Road Betterment Programme for North-West Sumatra and South Sulawesi
Road betterment programme for Menlaboh-Tapaktuan Road (200 km), North West Sumatra/Aceh and Palopo-Tarumpakae Road (140 km), South Sulawesihighway including all pertinent structures.
3. Padang-Bukittinggi Road
The Padang-Bukittinggi road, with a total length of approximately 81 km, traverses rolling and mountain ousterrain and had to be reconstructed following the existing alignment. The improvement embraced a new pavement overlay for the entire road length, including the construction of culverts.
4. Belawan-Medan-Tanjung-Morawa Highway
The Belawan-Medan-Tanjung-Morawa highway project, with a total length of approximately 34 km, was designed as an access controlled toll road facility comprising a divided highway with 2 lanes in each direction, and trumpet interchanges which include access roads with toll plazas. The proposed highway, including interchanges and access roads, is on a new alignment which traverses flat, low-level terrain requiring embankment construction throughout.

Disciplines
- Transportation
- Roads
Client
Ministry of Public Works and Power
Duration
From 1978 to 1988
Location
Indonesia , Indonesia
Project Activities
1. Jakarta-Cikampec Highway
- Traffic, feasibility and toll studies
- Detailed design
- Construction supervision.
2. Road Betterment Programme for North-West Sumatra and South Sulawesi
- Design
- Advisory services
- Construction supervision.
3. Padang-Bukittinggi Road
- Detailed design
- Tender evaluation
- Construction supervision.
4. Belawan-Medan-Tanjung-Morawa Highway
- Design
- Tender evaluation
- Construction supervision.