Vienna-Schwechat International Airport – New Parallel Runway Environmental Impact Approval

New parallel runway as an extension to the existing runway system at Vienna International Airport at Schwechat, comprising:

  • Approx. 3,700 m parallel runway and associated taxiways
  • Two approach / perimeter taxiways of up to approx. 2,600 m in length
  • Drainage facilities and pipe to the Danube river
  • potable water supply
  • Two de-icing units with a central utility station
  • fire station and hi-jacking

Disciplines

  • Airports

Companies

Dorsch Engineers GmbH

Client

Vienna Airport

Duration

From 1999 to 2008

Location

Vienna – Schwechat, Austria

Project Activities

  • Leader of a consortium (DC water and environment, DC airports, Neukirchen), all services for the environmental impact approval procedure (including technical planning) are done by this consortium
  • Preparation of expert reports on alternatives con- cerning the layout of the parallel runway
  • Preliminary design development
  • Design of flight operation facilities
  • Design of all drainage facilities
  • Coordination of the environmental experts and expert reports
  • Project supervision, coordination and management