Power Station Upgrade

  • Alteration of existing power house building at US Army field station
  • Installation of new diesel generating sets
  • Turnkey construction of a single-storey annex to the power plant
  • Construction of concrete-paved access road
  • Installation of heat recovery system, with connection to the existing plant

Disziplinen

  • Strom & Elektrizität
  • Anlagenbau

Auftraggeber

US Army Engineer Division, Europe (EUD)

Dauer

Von 1983 bis 1986

Standort

Sinop , Türkei

Projektleistungen

  • Architectural design of alteration and extension oft he building
  • Structural analysis
  • Structural design
  • Electrical design
  • Mechanical design
  • Civil Engineering
  • Preparation of tender documents
  • Cost estimate
  • Detailed engineering of dismantling of old generating sets and installation of new sets, in phases, thus ensuring the uninterrupted supply of electricity to the base
  • Engineering of water recovery system

Kontakt