Power Station Upgrade
- Alteration of existing power house building at US Army field station
- Installation of new diesel generating sets
- Turnkey construction of a single-storey annex to the power plant
- Construction of concrete-paved access road
- Installation of heat recovery system, with connection to the existing plant

Disziplinen
- Strom & Elektrizität
- Anlagenbau
Auftraggeber
US Army Engineer Division, Europe (EUD)
Dauer
Von 1983 bis 1986
Standort
Sinop , Türkei
Projektleistungen
- Architectural design of alteration and extension oft he building
- Structural analysis
- Structural design
- Electrical design
- Mechanical design
- Civil Engineering
- Preparation of tender documents
- Cost estimate
- Detailed engineering of dismantling of old generating sets and installation of new sets, in phases, thus ensuring the uninterrupted supply of electricity to the base
- Engineering of water recovery system