Power Station Upgrade
- Alteration of existing power house building at US Army field station
- Installation of new diesel generating sets
- Turnkey construction of a single-storey annex to the power plant
- Construction of concrete-paved access road
- Installation of heat recovery system, with connection to the existing plant

Disciplines
- Power & Electrical
- Industrial Engineering
Client
US Army Engineer Division, Europe (EUD)
Duration
From 1983 to 1986
Location
Sinop , Turkey
Project Activities
- Architectural design of alteration and extension oft he building
- Structural analysis
- Structural design
- Electrical design
- Mechanical design
- Civil Engineering
- Preparation of tender documents
- Cost estimate
- Detailed engineering of dismantling of old generating sets and installation of new sets, in phases, thus ensuring the uninterrupted supply of electricity to the base
- Engineering of water recovery system