A 59 - 6-lane expansion of T+R facility Liburer Heide to AS Airport
The section of the A 59 between the Cologne-Porz interchange and the Bonn-Ost interchange has very heavy traffic (DTV2025 = 121,500 vehicles/24h). The currently existing 2 or in some cases 3 lanes per direction and the lack of hard shoulders in some sections represent a considerable performance and traffic safety deficit.
The planning includes the continuous 6-lane expansion of the section between the T+R facility Liburer Heide and the airport junction (connection to Cologne/Bonn Airport). Extensive noise protection facilities have to be built on both sides of the motorway. The measure includes 13 intersections and 3 junctions that must be newly constructed or adapted to the planned cross-section. Furthermore, a new tank and service area will be built, as well as several infiltration and separation basins as part of the restructuring of the surface water drainage system.
Construction length: 7.2 km

Disciplines
- Roads
Companies
GRE German Rail Engineering GmbH
Client
Nordrhein-Westfalen Regional Road Construction Office Rhein-Berg, Branch Office Köln
Duration
From 2009 to 2018
Location
Rhein-Sieg-Kreis (North Rhine-Westphalia) , Germany
Project Activities
- Variant investigation for up to 9 variants,
- HOAI work phases 1-2
- Project planning for all traffic facilities,
- HOAI service phase 3
- Capacity calculations according to HBS
- Preliminary noise studies and design planning of noise protection facilities
- Preparation of a signage concept and detailed plans of the information boards
- Preliminary drainage investigations and design planning of drainage facilities
- Preliminary and draft planning for a petrol station and service area
- Preliminary investigation and design planning for traffic routing during construction