Planning and management of the construction of the first running water heat pump in Berlin

The plan is to engineer a flow heat pump combined with a CHP to participate in the iKWK subsidy program. It is an element of a larger district heating system of 250 MW thermal. It is embedded in the support mechanism for innovative CHP solutions. It is part of a decarbonization strategy of the district heating network in general and of a carbon-fired site in particular.

Outcome:

  • River heat pump 2 x 3.5 MW
  • Cogeneration 4 x 4.5 MW
  • Commissioning planned for winter 2022 heating season

Disciplines

  • Power & Electrical
  • Energy Infrastructure

Companies

BLS Energieplan GmbH

Client

BTB Berlin

Duration

From 2019 to 2022

Location

Berlin , Germany

Project Activities

  • Feasibility study for technical concept and eligibility
  • System conception to detail engineering
  • Integration technology into existing infrastructure
  • Commissioning and tendering
  • Construction management